Assembly II: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
+official description
m proper case
Line 28: Line 28:
   | Input3Qty  = 2
   | Input3Qty  = 2
   | Time        = 20
   | Time        = 20
   | Output1Name = Construction material i
   | Output1Name = Construction Material I
   | Output1Qty  = 4
   | Output1Qty  = 4
}}
}}
{{Recipe
{{Recipe
   | Input1Name  = Construction material i
   | Input1Name  = Construction Material I
   | Input1Qty  = 8
   | Input1Qty  = 8
   | Input2Name  = Copper
   | Input2Name  = Copper
   | Input2Qty  = 4
   | Input2Qty  = 4
   | Time        = 40
   | Time        = 40
   | Output1Name = Construction material ii
   | Output1Name = Construction Material II
   | Output1Qty  = 4
   | Output1Qty  = 4
}}
}}
[[Category:Unfinished_Machine]]
[[Category:Unfinished_Machine]]

Revision as of 10:16, 16 January 2022

Assembly (Electric)
T2

Electrified assembly line that is faster and can produce more advanced products.
Construction
50
Workers 8
Electricity 20 KW
Maintenance 1.0 / 60 
Required ResearchConstruction II
DesignationGeneral Machines 
VariantsAssembly I
Assembly III


Recipes

3
9
4
12
2
6
20 
60 
4
12
8
12
4
6
40 
60 
4
6