Metal Caster II: Difference between revisions
From Captain of Industry Wiki
Thadius856 (talk | contribs) Creation |
Thadius856 (talk | contribs) fix research |
||
Line 8: | Line 8: | ||
| Maintenance = None | | Maintenance = None | ||
| Footprint = 7x5 | | Footprint = 7x5 | ||
| Research = Advanced Smelting | |||
| Designation = Metallurgy & Smelting | | Designation = Metallurgy & Smelting | ||
}} | }} |
Revision as of 16:39, 18 January 2022
Workers | ![]() |
Electricity | None |
Maintenance | None |
Footprint | 7x5 |
Required Research | Advanced Smelting |
Designation | Metallurgy & Smelting ![]() |
The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.