Cooled Caster II: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
m typo
fix research
Line 15: Line 15:
| Maintenance  = None
| Maintenance  = None
| Footprint    = 7x5
| Footprint    = 7x5
| Research      = Steel Smelting
| Research      = Advanced Smelting
| Designation  = Metallurgy & Smelting
| Designation  = Metallurgy & Smelting
| Variants      = [[Cooled Caster]]
| Variants      = [[Cooled Caster]]

Revision as of 16:39, 18 January 2022

Cooled Caster II
T2

Casts molten materials into slabs. This one also utilizes water for cooling to speed up the process.
Construction
30
+
20
Workers 4
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting 
VariantsCooled Caster

The Cooled Caster II is a direct upgrade of the is the Cooled Caster machine. It features an identical footprint, input/output locations, and recipe ratios with the only difference being a higher overall throughput. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
20
2
5
24 
60 
8
20