Cooled Caster II: Difference between revisions
From Captain of Industry Wiki
Thadius856 (talk | contribs) fix research |
Thadius856 (talk | contribs) m typos |
||
| Line 19: | Line 19: | ||
| Variants = [[Cooled Caster]] | | Variants = [[Cooled Caster]] | ||
}} | }} | ||
The '''Cooled Caster II''' is a direct upgrade of | The '''Cooled Caster II''' is a direct upgrade of the [[Cooled Caster]] machine. It features an identical footprint, input/output locations, and recipe ratios with the only difference being a higher overall throughput. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow. | ||
==Recipes== | ==Recipes== | ||
Revision as of 16:41, 18 January 2022

Casts molten materials into slabs. This one also utilizes water for cooling to speed up the process.
| Construction | |
| Workers | |
| Electricity | None |
| Maintenance | None |
| Footprint | 7x5 |
| Required Research | Advanced Smelting |
| Designation | Metallurgy & Smelting |
| Variants | Cooled Caster |
The Cooled Caster II is a direct upgrade of the Cooled Caster machine. It features an identical footprint, input/output locations, and recipe ratios with the only difference being a higher overall throughput. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.