Assembly (Electric): Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
No edit summary
m fix bad references to "Construction Parts I" *sigh*
Line 5: Line 5:
| Recipe        =  
| Recipe        =  
   {{Machine Recipe
   {{Machine Recipe
     | Input1Name  = Construction Parts I
     | Input1Name  = Construction Parts
     | Input1Qty  = 50
     | Input1Qty  = 50
   }}
   }}
Line 28: Line 28:
   | Input3Qty  = 2
   | Input3Qty  = 2
   | Time        = 20
   | Time        = 20
   | Output1Name = Construction Parts I
   | Output1Name = Construction Parts
   | Output1Qty  = 4
   | Output1Qty  = 4
}}
}}
{{Recipe
{{Recipe
   | Input1Name  = Construction Parts I
   | Input1Name  = Construction Parts
   | Input1Qty  = 8
   | Input1Qty  = 8
   | Input2Name  = Copper
   | Input2Name  = Copper

Revision as of 05:32, 22 January 2022

Assembly (Electric)
T2

Electrified assembly line that is faster and can produce more advanced products.
Construction
50
Workers 8
Electricity 20 KW
Maintenance 1.0 / 60 
Footprint6x5
Required ResearchConstruction II
DesignationGeneral Machines 
VariantsAssembly (Manual)
Assembly (Electric) II

Recipes

3
9
4
12
2
6
20 
60 
4
12
8
12
4
6
40 
60 
4
6
8
6
4
3
80 
60 
4
3
8
6
6
4.5
80 
60 
12
9