Metal Caster II

From Captain of Industry Wiki
Revision as of 05:48, 22 January 2022 by Thadius856 (talk | contribs) (top: implement {{infoicon}})
Jump to: navigation, search
Metal Caster II
T2

Casts molten materials into slabs.
Construction
20
Workers 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting 
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
20
24 
60 
8
20
8
20
24 
60 
8
20