Flat Conveyor: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
Update electric/maint. consumption for U3
mNo edit summary
 
Line 18: Line 18:
'''Flat Conveyor''' is a better way to solve logistical tasks for [[:Category:Unit products|Unit Products]] after leaving the beginning stage of the game. It is used to transport items between buildings automatically, and continuously, without using vehicles. It can connect to [[Flat Balancer]] and [[Flat Sorter]].
'''Flat Conveyor''' is a better way to solve logistical tasks for [[:Category:Unit products|Unit Products]] after leaving the beginning stage of the game. It is used to transport items between buildings automatically, and continuously, without using vehicles. It can connect to [[Flat Balancer]] and [[Flat Sorter]].


The Conveyor requires {{infoicon|Electricity}}, and its amount depends on the length of the Conveyor segment. The required electricity is not directly proportional to the length, but to the length to the power of roughly 0.7.
The Conveyor requires {{infoicon|Electricity}} and {{infoicon|Maintenance I}} proportional to the length of the segment.


{{infoicon|Electricity}} consumption for a belt segment appears to be 1 kW plus 0.20, 0.40, or 0.80 kW per tile for tier I, II, and III belts, respectively.
{{infoicon|Electricity}} consumption for a belt segment appears to be 1 kW plus 0.20, 0.40, or 0.80 kW per tile for tier I, II, and III belts, respectively.

Latest revision as of 18:46, 12 July 2025

Flat Conveyor
T1

Transports units of solid products.
Construction
28
+
28
per 100 tiles (rounded up)
CargoUnit products
Throughput60 / 60 
DesignationTransports 
VariantsFlat Conveyor II
Flat Conveyor III

Flat Conveyor is a better way to solve logistical tasks for Unit Products after leaving the beginning stage of the game. It is used to transport items between buildings automatically, and continuously, without using vehicles. It can connect to Flat Balancer and Flat Sorter.

The Conveyor requires Electricity and Maintenance I proportional to the length of the segment.

Electricity consumption for a belt segment appears to be 1 kW plus 0.20, 0.40, or 0.80 kW per tile for tier I, II, and III belts, respectively.

Maintenance I consumption per 100 tiles is 1 for T1, 2 for T2, and 3.5 for T3.


Electricity Consumption of U-shape Conveyors and Flat Conveyors (version 0.7.6)
Length
(Cells)
Electricity (KW) Maintenance I
Conveyor Conveyor II Conveyor III Conveyor Conveyor II Conveyor III
100 21 41 81 1 2 3.5
16 6.4 13.8 26.6 0.32 0.64 1.12
128 26.6 52.2 103.4 1.28 2.56 4.48