Metal Caster II: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
m Recipes: +{{recipe fetch|isbldg=yes}}
NaK (talk | contribs)
m Update parameters in infobox machine
Line 5: Line 5:
| Recipe        =
| Recipe        =
   {{Machine Recipe
   {{Machine Recipe
     | Input1Name  = Construction Parts III
     | Input1Name  = Construction Parts II
     | Input1Qty  = 20
     | Input1Qty   = 40
    | Input2Name  = Steel
    | Input2Qty   = 20
   }}
   }}
| Workers      = 3
| Workers      = 3

Revision as of 01:00, 18 August 2022

Metal Caster II
T2

Casts molten materials into slabs.
Construction
40
+
20
Workers 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting 
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
24
20 
60 
8
24
8
24
20 
60 
8
24
8
24
20 
60 
8
24