Cooled Caster: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
Vekking (talk | contribs)
No edit summary
Phoenixx (talk | contribs)
m fix price
Line 6: Line 6:
   {{Machine Recipe
   {{Machine Recipe
     | Input1Name  = Construction Parts II
     | Input1Name  = Construction Parts II
     | Input1Qty  = 23
     | Input1Qty  = 30
}}
}}
| Workers      = 4
| Workers      = 4

Revision as of 16:49, 9 July 2022

Cooled Caster
T1

Casts molten materials into slabs. This one also utilizes water for cooling to speed up the process.
Construction
30
Workers 4
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchSteel Smelting
DesignationMetallurgy & Smelting 
VariantsCooled Caster II

The Cooled Caster is the first machine unlocked which is used in the production of Molten Steel into Steel. It operates identically to the Metal Caster and has the same ratios/timing, except that it also requires a small amount of Water. Visually it is identical to the Metal Caster except the addition of a liquid port opposite the output line (not shown above).

Recipes

8
12
4
6
40 
60 
8
12