High-Pressure Turbine: Difference between revisions
From Captain of Industry Wiki
No edit summary |
m fix build cost |
||
| Line 6: | Line 6: | ||
{{Machine Recipe | {{Machine Recipe | ||
| Input1Name = Construction Parts II | | Input1Name = Construction Parts II | ||
| Input1Qty = | | Input1Qty = 50 | ||
}} | }} | ||
| Electricity = None | | Electricity = None | ||
Revision as of 18:16, 30 July 2022
| Construction | |
| Workers | |
| Electricity | None |
| Maintenance | |
| Footprint | 7x5 |
| Required Research | Power Generation II |
| Designation | Power Production |
| Variants | High-Pressure Turbine II Low-Pressure Turbine Low-Pressure Turbine II |
Recipes
| |
| |
| * Only available in the Supporter Edition | |
