Metal Caster II: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
NaK (talk | contribs)
m Update parameters in infobox machine
NaK (talk | contribs)
m Recipes: Fixed improper value
Line 24: Line 24:
   | Input1Name  = Molten Iron
   | Input1Name  = Molten Iron
   | Input1Qty  = 8
   | Input1Qty  = 8
   | Time        = 24
   | Time        = 20
   | Output1Name = Iron
   | Output1Name = Iron
   | Output1Qty  = 8
   | Output1Qty  = 8
Line 31: Line 31:
   | Input1Name  = Molten Copper
   | Input1Name  = Molten Copper
   | Input1Qty  = 8
   | Input1Qty  = 8
   | Time        = 24
   | Time        = 20
   | Output1Name = Impure Copper
   | Output1Name = Impure Copper
   | Output1Qty  = 8
   | Output1Qty  = 8

Revision as of 20:32, 10 September 2022

Metal Caster II
T2

Casts molten materials into slabs.
Construction
40
+
20
Workers 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting 
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
24
20 
60 
8
24
8
24
20 
60 
8
24
8
24
20 
60 
8
24