Metal Caster II: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
L32 (talk | contribs)
m Line breaks fix
mNo edit summary
Line 16: Line 16:
| BoostByUnity  = yes
| BoostByUnity  = yes
| Research      = Advanced Smelting
| Research      = Advanced Smelting
| Designation  = Metallurgy & Smelting
| Designation  = Smelting
| Variants      = [[Metal Caster]]
| Variants      = [[Metal Caster]]
}}
}}

Revision as of 17:36, 21 June 2025

Metal Caster II
T2

Casts molten materials into slabs.
Construction
40
+
20
Workers 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
Boost by UnityAvailable
DesignationSmelting 
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

Below are all the recipes, which this building is capable of producing. Note, that some of them may be locked behind Research, and not immediately available in your game.

8
24
20 
60 
8
24
8
24
20 
60 
8
24
8
24
20 
60 
8
24