Metal Caster II: Difference between revisions
From Captain of Industry Wiki
Thadius856 (talk | contribs) m →Recipes: +navbox |
Thadius856 (talk | contribs) m →Recipes: {{Recipe}} -> {{recipe define}} |
||
Line 19: | Line 19: | ||
==Recipes== | ==Recipes== | ||
{{ | {{recipe define | ||
| Input1Name = Molten Iron | | Input1Name = Molten Iron | ||
| Input1Qty = 8 | | Input1Qty = 8 | ||
Line 26: | Line 26: | ||
| Output1Qty = 8 | | Output1Qty = 8 | ||
}} | }} | ||
{{ | {{recipe define | ||
| Input1Name = Molten Copper | | Input1Name = Molten Copper | ||
| Input1Qty = 8 | | Input1Qty = 8 |
Revision as of 09:53, 29 January 2022
Construction | |
Workers | ![]() |
Electricity | None |
Maintenance | None |
Footprint | 7x5 |
Required Research | Advanced Smelting |
Designation | Metallurgy & Smelting ![]() |
Variants | Metal Caster |
The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.