Cooled Caster II: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
m Recipes: {{Recipe}} -> {{recipe define}}
m Recipes: +{{recipe fetch|isbldg=yes}}
Line 30: Line 30:
   | Output1Qty  = 8
   | Output1Qty  = 8
}}
}}
{{recipe fetch|isbldg=yes}}


{{Navbox/Machines}}
{{Navbox/Machines}}

Revision as of 10:01, 29 January 2022

Cooled Caster II
T2

Casts molten materials into slabs. This one also utilizes water for cooling to speed up the process.
Construction
30
+
20
Workers 4
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting 
VariantsCooled Caster

The Cooled Caster II is a direct upgrade of the Cooled Caster machine. It features an identical footprint, input/output locations, and recipe ratios with the only difference being a higher overall throughput. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
24
4
12
20 
60 
8
24
8
24
4
12
20 
60 
8
24