Cooling Tower (Large): Difference between revisions
From Captain of Industry Wiki
Update recovery rate and build ratios based upon newer recipe |
m fix price |
||
Line 6: | Line 6: | ||
{{Machine Recipe | {{Machine Recipe | ||
| Input1Name = Construction Parts III | | Input1Name = Construction Parts III | ||
| Input1Qty = | | Input1Qty = 80 | ||
| Input2Name = Concrete Slab | | Input2Name = Concrete Slab | ||
| Input2Qty = | | Input2Qty = 200 | ||
}} | }} | ||
| Workers = 4 | | Workers = 4 |
Revision as of 02:24, 13 July 2022
Construction | |
Workers | ![]() |
Electricity | None |
Maintenance | None |
Footprint | 9x9 |
Required Research | Nuclear Reactor |
Designation | Water Extraction & Processing ![]() |
Variants | Cooling Tower |
The Cooling Tower (Large) is a much higher throughput and physically much larger variant of the Cooling Tower which allows for the conversion of Steam (High), Steam (Low), and Steam Depleted byproducts into Water. As the ratio of Water to all types of steam is 1:1, the Cooling Tower (Large) thus recovers 75% of the Water contained therein. Compared to the regular Cooling Tower, this marks a 50% increase in the Water recovery rate.
It can process the resulting steam output from up to 8 Arc Furnace II machines or 4 Exhaust Scrubbers. Conversely, it takes exactly 3 of these to handle the steam output of a single Nuclear Reactor.
Recipes
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
Planned or Proposed | |
* Only available in the Supporter Edition |