Retaining Wall: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
Phoenixx (talk | contribs)
No edit summary
NaK (talk | contribs)
Delete legacy information
Line 40: Line 40:


Retaining walls, as other buildings (with the exception of pipes?), will start to take damage as any of it's 8 foundation tiles is lowered below the bottom or risen above top of its 3D model.
Retaining walls, as other buildings (with the exception of pipes?), will start to take damage as any of it's 8 foundation tiles is lowered below the bottom or risen above top of its 3D model.
It is advised to place Retaining Walls exactly on the center of a excavating/dumping tile border, as otherwise excavators will be able to dig "through" the wall and trucks dump "over" it, when assigned to a mining tile which is colliding with the wall.


Retaining Wall (Long) is exactly the length of a mining/dumping tile, which is 4x4.
Retaining Wall (Long) is exactly the length of a mining/dumping tile, which is 4x4.


{{Navbox/Machines}}
{{Navbox/Machines}}

Revision as of 20:36, 1 September 2022

Retaining Wall (Long)

Wall that retains ground level.
Construction
12
+
40
WorkersNone
ElectricityNone
MaintenanceNone
Footprint2x4
Required ResearchRetaining Walls
DesignationBuildings (For Vehicles) 
VariantsRetaining Wall (Short)
Retaining Wall (Long)
Retaining Wall (Cross)
Retaining Wall (Tee)

Retaining Walls is a structure that prevents the falling of already existing or dumped Loose products while the tile behind it is excavated or dumped on.

It exists in 5 variants with with different footprints: (1x2, 2x2 and 2x4):

Image Name Footprint Recipe
Retaining Wall (Short) 1x2
3
+
10
Retaining Wall (Corner) 2x2
6
+
12
Retaining Wall (Cross)
Retaining Wall (Tee)
Retaining Wall (Long) 2x4
12
+
40

Retaining wall can be built with different levels of submersion to the ground. On perfectly flat ground theres 6 different levels of submersion, on steep slopes there can be none.

Retaining walls, as other buildings (with the exception of pipes?), will start to take damage as any of it's 8 foundation tiles is lowered below the bottom or risen above top of its 3D model.

Retaining Wall (Long) is exactly the length of a mining/dumping tile, which is 4x4.