Cooling Tower (Large)
T2

Improves Water efficiency of a power plant by recovering some Steam back to Water.
Construction
60
+
150
Workers 4
ElectricityNone
MaintenanceNone
Footprint9x9
Required ResearchNuclear Reactor
DesignationWater Extraction & Processing 
VariantsCooling Tower

The Cooling Tower (Large) is a much higher throughput and physically much larger variant of the Cooling Tower which allows for the conversion of Steam (High), Steam (Low), and Steam (Depleted) byproducts into Water. As the ratio of Water to all types of steam is 1:1, the Cooling Tower (Large) thus recovers 75% of the Water contained therein. Compared to the regular Cooling Tower, this marks a 50% increase in the Water recovery rate.

It can process the resulting steam output from up to 8 Arc Furnace II machines or 4 Exhaust Scrubbers. Conversely, it takes exactly 3 of these to handle the steam output of a single Nuclear Reactor.

Recipes

16
96
10 
60 
12
72
16
96
10 
60 
10
60
16
96
10 
60 
12
72
16
96
10 
60 
8
48