Metal Caster II

From Captain of Industry Wiki
Revision as of 01:00, 18 August 2022 by NaK (talk | contribs) (Update parameters in infobox machine)
Jump to: navigation, search
Metal Caster II
T2

Casts molten materials into slabs.
Construction
40
+
20
Workers 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting 
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
24
20 
60 
8
24
8
24
20 
60 
8
24
8
24
20 
60 
8
24