Retaining Wall
From Captain of Industry Wiki
Construction | |
Workers | None |
Electricity | None |
Maintenance | None |
Footprint | 2x4 |
Required Research | Retaining Walls |
Designation | Buildings (For Vehicles) ![]() |
Variants | Retaining Wall (Short) Retaining Wall (Long) Retaining Wall (Cross) Retaining Wall (Tee) |
Retaining Walls is a structure that prevents the falling of already existing or dumped Loose products while the tile behind it is excavated or dumped on.
It exists in 5 variants with with different footprints: (1x2, 2x2 and 2x4):
Image | Name | Footprint | Recipe |
---|---|---|---|
![]() |
Retaining Wall (Short) | 1x2 | |
![]() |
Retaining Wall (Corner) | 2x2 | |
![]() |
Retaining Wall (Cross) | ||
![]() |
Retaining Wall (Tee) | ||
![]() |
Retaining Wall (Long) | 2x4 |
Retaining wall can be built with different levels of submersion to the ground. On perfectly flat ground theres 6 different levels of submersion, on steep slopes there can be none.
Retaining walls, as other buildings (with the exception of pipes?), will start to take damage as any of it's 8 foundation tiles is lowered below the bottom or risen above top of its 3D model.
Retaining Wall (Long) is exactly the length of a mining/dumping tile, which is 4x4.
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
Planned or Proposed | |
* Only available in the Supporter Edition |