Data Center: Difference between revisions

From Captain of Industry Wiki
Jump to: navigation, search
NaK (talk | contribs)
m Fix table
NaK (talk | contribs)
m Fix name in expression
Line 57: Line 57:


'''General expression'''
'''General expression'''
:{{infoicon|Chilled Water|new=yes}} = (75/128) x (Number of Server - α) {{time}}
:{{infoicon|Chilled Water|new=yes}} = (75/128) x (Number of Server Racks- α) {{time}}
::α: truncates "0.15 x Number of Server - 0.40" to integer
::α: truncates "0.15 x Number of Server Racks - 0.40" to integer
:{{infoicon|Maintenance III|new=yes}} = (0.55075 x Number of Server + 3.815) {{time}}
:{{infoicon|Maintenance III|new=yes}} = (0.55075 x Number of Server Racks + 3.815) {{time}}
:{{infoicon|Electricity}} = (5 x Number of Server) KW
:{{infoicon|Electricity}} = (5 x Number of Server Racks) KW




{{Navbox/Machines}}
{{Navbox/Machines}}

Revision as of 13:33, 25 August 2022

Data Center

Datacenter is used to host server racks that you add to it. Each added server rack provides computing as a resource that can be used on your island. Computing is used in advanced machines such as robotic assemblers or microchip makers. It is worth noting that each server rack has its power, cooling, and maintenance demands. However, some people say that all it does is to persist and search in a vast collection of pictures of cats and memes - we were not able to debunk this.
Construction
100
+
120
+
20
Workers 6
Electricity 0 - 240 KW
Computing 0 - +48 TFlops
Maintenance 4.0 / 60 
Footprint18x11
Required ResearchComputing
DesignationGeneral Machines 

The Data Center is a machine containing up to 48 server racks. Each server rack is able to provide 1 TFlops of Computing Power. A single server rack consists of 20 Servers and can be assembled instantly in the Data Center as long as there are enough Servers in the player's storage.

The Data Center requires Electricity, Chilled Water, and Maintenance III. An amount of them is shown following table and expression.


Server Rack Chilled Water
( / 60 )
Maintenance III
( / 60 )
Electricity
(KW)
0 0.0 3.8 0
1 0.6 4.4 5
2 1.2 4.9 10
4 1.8 6.0 20
8 4.1 8.2 40
12 5.9 10.4 60
16 8.2 12.6 80
24 11.7 17.0 120
32 15.8 21.4 160
40 19.9 25.8 200
48 24.0 30.3 240

General expression

Chilled Water = (75/128) x (Number of Server Racks- α) / 60
α: truncates "0.15 x Number of Server Racks - 0.40" to integer
Maintenance III = (0.55075 x Number of Server Racks + 3.815) / 60
Electricity = (5 x Number of Server Racks) KW